We strongly believe that clean, renewable energy holds the answer to a better planet. Technological advances in clean energy have led to a much lower environmental impact than conventional energy technologies. By investing in renewable energy in Nepal, we hope to contribute 900 megawatts to the country’s sustainability portfolio.

Upper Balephi Hydropower Project

The Upper Balephi Hydropower Project is a run-of-river (ROR) hydropower initiative situated along the Balephi River in the Sindhupalchowk district of Bagmati Province. The headworks and powerhouse are strategically positioned in Jugal Rural Municipality. With an installed capacity of 46.0 MW, the project aims to achieve this output by utilizing a design discharge of 11.78 m³/s. This discharge represents the 40th percentile probability of exceedance of the available flow. The project utilizes a gross head of 460.75 m to generate power efficiently.  

Brief Description

1Headworks and Intake Structure Weir
Project NameUpper Balephi Hydropower Project
Source RiverBalephi Khola
ProvinceBagmati Province
LocationJugal Rural Municipality
DistrictSindhupalchowk
Latitude27°58’ 59” N and 28°01’ 23” N
Longitude85°46’ 46” E and 85°48’ 03” E